Estate Development

Royal Palm Executive Enclave — Master-Planned Gated Estate Development

Turnkey development of a 24-unit executive residential enclave complete with internal paved road networks, covered storm drains, underground electrical reticulation, borehole water treatment, Stone-Coated roofing, and bespoke POP ceilings.

CLIENT: GWMC Estate Development & Private Consortium
LOCATION: East Legon Hills — Katamanso Axis, Greater Accra
CONTRACT MODEL: Turnkey Master-Planned Estate & Infrastructure
PROGRAMME DURATION: 16 Months (2024–2025)
HSE RECORD: 290,000 Man-Hours (Zero LTI)
Residential Units 24 Executive Villas
Site Footprint 4.6 Hectares
Water Autonomy 120,000L Storage + RO
Power System 500kVA Substation + Solar
Royal Palm Executive Enclave — Master-Planned Gated Estate Development
SITE PHOTOGRAPH // PRJ-EST-2501 East Legon Hills — Katamanso Axis, Greater Accra

Integrated Self-Perform Delivery Model

Unlike conventional estate developers that subcontract every trade to fragmented artisans, Global World Mining and Construction Limited delivered the Royal Palm Executive Enclave using our unified in-house divisions—from initial bulk earthworks and road paving to structural concrete frames, stone-coated steel roofing, pressurized plumbing, electrical wiring, and luxury Plaster of Paris (POP) interior ceilings.

Primary Civil & Utility Infrastructure

Before vertical building works commenced, our Civil and MEP divisions established complete municipal-grade underground utilities across the 4.6-hectare gated perimeter:

  • Internal Roads & Drainage: 1.8 km of 80mm heavy-duty interlocking concrete block roads bordered by covered reinforced concrete U-drains and pedestrian walkways.
  • Potable Water Reticulation: Dual deep boreholes paired with a containerized reverse-osmosis filtration plant, 120,000-liter elevated/ground storage tanks, and variable-frequency booster pumps delivering constant 3.5-bar pressure to every plot.
  • Underground Power & Security: Dedicated 500kVA transformer substation, armoured underground LV feeder cables, solar LED street lighting, and fiber-optic perimeter CCTV integration.

Architectural Finishing Standards

Each 4-bedroom detached residence was constructed with C30 structural concrete frames, corrosion-resistant AZ150 stone-coated steel roofing tiles, concealed PN20 PPR plumbing stacks, BS 7671 certified electrical distribution boards, and multi-level laser-aligned POP suspended ceilings with recessed warm LED cove illumination.

Additional Field Documentation

Royal Palm Executive Enclave — Master-Planned Gated Estate Development — Field View 2
Royal Palm Executive Enclave — Master-Planned Gated Estate Development — Field View 3